一种基于改进土地覆盖更新方法的新增建设用地自动提取 |
| 张因果,陈芸芝 |
|
Automatic Extraction of New Construction Land based on an Improved Method of Updating Land Cover Maps |
| Yinguo Zhang,Yunzhi Chen |
| 图8 2017建设用地精度与迭代次数的关系 in 2017 and iteration number |
| Fig.8 Relationship between accuracy of built-up land |
|