极轨卫星地表温度时间归一化方法—以MODIS为例
胡解君德,杨英宝,潘鑫,常沁楠,王爱辉

A Land Surface Temperature Temporal-effect Normalization Method for Polar-orbiting Satellite: A Case Study of MODIS
Junde HUXIE,Yingbao YANG,Xin PAN,Qinnan CHANG,Aihui WANG
表5 两种方法时间归一化误差(各归一化时刻,模拟数据)
Table 5 Errors of temporally normalized LST of two methods at each time (analog data)
站点

归一化

目标时刻

未进行归一化INA08_2归一化结果BDTNM归一化结果
RMSE/KrMAE/KRMSE/KrMAE/KRMSE/KrMAE/K

张掖

湿地站

30.990.560.700.970.540.830.910.640.63
121.200.491.051.300.951.230.200.990.19
140.320.990.240.280.990.260.200.990.17
230.380.710.231.910.711.860.290.820.21

黑河

遥感站

30.400.780.301.970.931.960.320.860.20
122.26-0.062.001.460.961.420.400.950.38
140.240.990.200.400.980.320.310.980.19
230.460.440.362.810.832.790.360.580.28

大满

超级站

30.690.820.510.910.820.760.610.850.44
121.510.341.270.730.870.650.510.930.42
140.480.980.260.720.970.550.430.970.31
230.810.770.601.280.681.150.500.900.44